|
BioCold project engineers are available for consultation with architects, laboratory planners,
and end users, providing environmental room project design recommendations, value engineering
ideas, and technical equipment data.
Laboratory and facility design involves numerous specialties, and we recognize that it is
difficult for architects and lab planners to keep up with the latest developments in every
field. Changing technologies and environmental considerations are reshaping the face of
environmental room manufacturing, from the phasing out of CFC refrigerants, solid state
thermostats and small semi-hermetic condensing units, to the introduction of zero-emission
blowing agents, PSC fan motors, and touchscreen controls with remote communication functionality.
BioCold is pleased to review project plans and specifications upon request. A sample specification
is available for download. To discuss a project with a BioCold project engineer, or to request
more detailed drawings, schematics, manuals and equipment datasheets, call (636) 349-0300 or
e-mail us.
|